AI that reads every bid, catches every gap, and recommends the winner — in minutes.
| Subcontractor | Base | Adjustments | Adjusted total | Status |
|---|---|---|---|---|
Pacific Concrete Co. Includes formwork & finishing | $1,240,000 | +$0 | $1,240,000 | Lowest — recommend |
Cascade Structural Excludes finishing — AI flagged | $1,185,000 | +$68,000 | $1,253,000 | Scope gap adjusted |
NW Foundation Ltd. Full scope match | $1,310,000 | +$0 | $1,310,000 | Within range |
Columbia Concrete Includes value-eng. alternate | $1,490,000 | −$95,000 | $1,395,000 | Above budget |
And one missed exclusion can cost six figures.
No spreadsheets, no rekeying, no judgement calls in the dark.
Add name, location, square footage.
One per CSI division — tag the drawing phase.
PDF, Excel, Word — digital or scanned.
Our AI reads every line, flags every gap.
Side-by-side $/SF with an AI recommendation.
Every feature maps to something an estimator does today — just faster.
Every missing item, flagged with the bidder who excluded it.
PDF, Excel, Word. OCR on scanned PDFs is automatic.
Div 00–48 grouped exactly like your specs.
See how the same trade re-priced from SD to IFC.
Per-square-foot rates calculated automatically.
Owner, admin, estimator, viewer — locked to your company.
Defensible awards without the spreadsheet marathon.
Hours of comparison work, done in minutes.
Bid intelligence and phase cost movement on demand.
Compare every iteration as drawings evolve.
AI bid comparison, scope coverage, $/SF, phase comparison.
Predictive budgets before drawings exist.
Procore, Buildertrend, Sage — zero re-entry.
Network-powered cost benchmarks, anywhere.
Apples-to-apples comparison with scope coverage and $/SF.
Credible budgets before a single drawing is produced.
Real-time cost intelligence for any building, anywhere.
Sign up and upload your first bids in under five minutes.
Start free trialNo credit card required · Cancel anytime