Skip to content
MyLevelBid
Sample · fictional
Riverside Mixed-Use Development · Div 03 — Concrete · 100% CDs

Structural & Site Concrete

Summary

The cross-bid takeaway — overview, key findings, and recommendation.

Bidders

Ranked by adjusted value (base + alternates to close scope gaps). Click a bidder for a coverage drill-down.

Line-item comparison

Grouped by CSI section — expand only what you need. Cheapest carried price per line glows teal.

Focus:
Scope section / line
Tannerbrook Structural Concrete
$4.3M · 66%
Maplestone Concrete Constructors
$4.2M · 63%
Brindlewood Concrete Structures
$4.6M · 95%
Kestrel Ridge Concrete
$4.3M · 47%
Ironvale Concrete and Formwork
$4M · 62%
A. General requirements
01 10 00· 5 lines
$241,2001 gap~$174,0002 gaps$238,500~$240,0004 gaps$200,5002 gaps
B. Foundations
03 30 53· 3 lines
$803,900$902,000$808,300$1,012,000$771,650
C. Slabs on grade
03 31 00· 2 lines
$231,500$233,500$229,600$241,000$218,970
D. Vertical concrete
03 30 10· 2 lines
$611,100$611,000$626,200$618,000$590,100
E. Elevated decks
03 30 20· 3 lines
$1,213,000$1,203,000$1,226,600~$1,238,000$1,155,000
F. Reinforcing and post-tensioning
03 20 00· 2 lines
$687,500$708,000$717,900~$722,000$677,750
G. Below-grade waterproofing
07 13 26· 1 line
$85,000$98,500$109,500—1 gap—1 gap
H. Stairs, curbs and pads
03 30 30· 3 lines
$112,400$98,5001 gap$117,200$119,0001 gap$111,000
I. Finishes and toppings
03 35 00· 4 lines
$43,9002 gaps$59,5002 gaps$237,800—4 gaps$35,4403 gaps
J. Site concrete
32 13 13· 1 line
$97,300—1 gap$93,800—1 gap$90,340
K. Placing, hoisting and protection
03 30 40· 4 lines
$184,200~$148,0001 gap$198,100~$98,0003 gaps$150,1401 gap
Base bid total
$4,311,000
adj $4,345,300
$4,236,000
$4,603,500
$4,288,000
$4,000,890
adj $4,062,690
Cheapest on this lineExplicitly excludedNot addressed (silent gap)· "adj" = base + scope-gap alternates· "~" = estimated share of a bidder's lump sum, not a price they quoted for that line; never counted as cheapest

Alternates

The same alternate, bidder by bidder. Tick one to take it from every bidder who priced it.

AlternateTannerbrook Structural ConcreteMaplestone Concrete ConstructorsBrindlewood Concrete StructuresKestrel Ridge ConcreteIronvale Concrete and Formwork
deduct $96,000deduct $82,000deduct $88,000not listeddeduct $104,000
deduct $28,000not priceddeduct $36,500not listednot priced
not pricedadd $52,950add $46,035not listedadd $44,010
add $71,500not pricedadd $64,000not listedadd $58,500
Adjusted totalbase bid plus every alternate taken$4,345,300$4,236,000$4,603,500$4,288,000$4,062,690

Matched by the alternate's number on each bid. A tick here is the same as ticking that alternate in each bidder's row, so the totals and ranking above update with it. Alternates a bidder offered on its own are in that bidder's row.

Five bids in five formats, leveled in minutes.

Run the bids from a job you're pricing right now. Free for 30 days, no credit card, and nothing is charged on day 31.

Start your free month Or have us walk you through it